2015 Addition

8,400 sq. ft. arts suite addition to the existing CDA Charter Academy High School. The project includes spaces for the schools theater, visual arts, choir, and band programs. The scope of the project includes carpet replacement / addition to the existing hight school and a folding partition for the addition as described in the bidding documents.

Annex Building

Added a gymnasium/multipurpose room and 4 additional classrooms.  Selective demo & preservation of existing classrooms.  Also, remodeled sections of the existing building.  Structural CMU and steel post and beam construction, with steel open web roof joists, and metal pan deck with single ply membrane roof.  Work completed on tight  summer schedule, while school was on summer recess.

Leave a Reply