WP#1, #2, & #3: Included building demolition, selective demolition, erection of earthen shoring walls, site work & mass excavation, utilities, site concrete, structural concrete, concrete floor slabs, structural steel & pandecks (all for 4 story + basement addition). Included infection control, temporary walls, & provision and maintenance of temporary facilities. Included all general carpentry tasks as required by the owner. Provided & installed doors, hardware, Division 10 specialties, & owner supplied items.